Make
FINLAY
Model
693 Triple Wash Plan
Category
Aggregate Equipment: Screener
Year
2003
Location
UK: United Kingdom of Great Britain and Northern Ireland
United Kingdom (Devon)
Hours
600
Condition
Very good condition
Price
Price on Request

Description

  • ID: 1019
  • Finlay 693 - year 2003 - Fully Refurbished Last Year and since then done 500-600 hours, As NEW.
  • Log Washer - year 1991 - Fully Refurbished Last Year and since then done 500-600 hours, As NEW (German make).
  • Dewaterer machine has been manufactured in 2013, again only 500-600 hours, As NEW.
  • Galvanized conveyors are built in 2003, Last Year New Rollers etc... (German make).
  • Radial conveyor - year unknown but Fully Refurbished last year, New Rollers, New Belt etc.
  • Whole Plant is in Full Perfect Working Order.
  • 1.
  • Static Rinser 2 Deck Finlay 693 Year 2003, 2 deck screen box: Top 6.1m x 1.52m, Bottom 4.88m x 1.52m, last year fully refurbished including all new belts, rollers, sand blasted and painted with double coat of paint, Live Head over the hopper (vibrating grid), Electric Drive.
  • 2.
  • Liebchen Twin Shaft Log Washer, 8000mm x 2500mm, fully refurbished last year including new blades, reinforced bottom floor and side walls, sand blasted and repainted and just recently new bearings installed.
  • 3.
  • Washing Horizontal Screen, 2 deck screen box - 4200mm x 1500mm, driven by high amplitude electro-vibrators.
  • 4.
  • Bucket Wheel Dewaterer machine with capacity of up to 150 T/H of one grade of sand 0-2mm.
  • 5.
  • 1 x 25m Radial Stock Piling Conveyor to transport the sand from dewaterer.
  • 6.
  • 3 x High Quality Galvanized Stockpiling Conveyors 2 x 18m and 1 x 20m. They transport products: 2-8mm, 8-16mm and 16-32mm.
  • 7.
  • Caterpillar 220kW Container Generator with built in fuel tanks with capacity of 3000 liters.
  • 8.
  • Electric 75kW Water Pump with capacity up to 350m3/h.
  • Production Process:
  • Finlay 693 is loaded with 120mm where material -120mm drops down to the screen and the rest so +120mm stays on the grid and is rejected.
  • The material then is washed over two decks and is separated to:
  • 0-2mm which goes with water through the pipe directly to Dewaterer Bucket Wheel machine where sand is separated from the water and goes to 25m Radial Stockpiling Conveyor,
  • 2-8mm / 8-16mm / 16-32mm goes from to the side belt of the main screen and from there directly to the Log Washer where they get second wash and from there they go to 2 deck Horizontal Wash Screen where they get third wash and from there washed material goes to 3 Separate Stock Piling Conveyors and the sludge goes back to Bucket Wheel machine to reclaim 0-2mm.
  • 32mm+ goes to the second side belt of the main screen and then is stockpiled.
  • The whole plant works in the sand quarry with approx. 65% of Sand and 20% Hard to Wash Clay and Production Capacity in this conditions is up to 200T/H.
  • Thanks to Triple Washing Process the Final Product is Completely Free from Clay.
  • The Plant was design to work in the in quarries containing Clay which in the process is removed completely.
  • Plant can be seen working.
  • WORLDWIDE EXPORT AND DELIVERY ARRANGED.
*
Ø

Similar Machines

(Similar models of the same year with comparable operating hours.)