Description

  • Natural Gas fired Combined Cycle Power Plant
  • 93 MWe
  • This is a Combined Cycle Cogeneration Power Plant (CCCPP) able to supply about 30 t/h of surplus steam at 80 bar/520°C (50 t/h with post-firing) for any technological application over and above 93 MW of electric power output. It was first synchronized in October 1997 and entered into commercial operation on February 1998; last full load operation was in March, 8th, 2011.
  • As a single-shaft line, it is composed by:
  • One (1) General Electric MS6001FA gas turbine (Frame 6FA)
  • One (1) Heat Recovery Steam Generator (HRSG) producing steam at two different pressure levels (80 and 3 bar)
  • One (1) General Electric condensing steam turbine, with steam extraction
  • One (1) General Electric generator, connected both to gas and steam turbine
  • The step up transformer is provided with three windings since the original design foresees the predisposition to add a second steam turbine with its own generator. Several Gas Turbine’s Capital spare parts are available.Major Inspection was performed at 48.000 OH, in 2003; next Major Inspection is planned at 96.000 OH.