Make
Peri
Model
Peri Trio 300m2 inklusive Zubehör
Category
Construction / Concrete Equipment / Formwork
Year
2003
Location
Europe (Continental): Austria
5202 Neumarkt Austria
Condition
Used
Price
Price on Request

Description

26x TR 270x240
8x TR 270x120
8xTR 270x90
8x TR 270x72
6x TR 270x60
6x TR 270x30
6x TE 270-2
200x BFD
2x RP-2 80x150
56x Maximo Stacking
10x WDA-2 270x5
10x TRG 80
160x Tie nut
80x Tierod DW 15 1,00m

TRIO is the universal formwork system for all applications where the main focus is on reducing the shuttering times with conventional DW tie technology. With the BFD coupler for virtually all connections as well as many other practical system solutions, TRIO has successfully proven itself in countless projects around the world. TRIO can be used together with the more advanced MAXIMO panel formwork. A large range of accessories, such as the BFD Coupler or MXK Bracket System, can be used in both systems.
Easy and simple connections
with the BFD Alignment Coupler as the only component for all panel connections
Fast working operations
with only a minimum of panel widths as well as panels that can be used both horizontally and vertically

Maximum permissible fresh concrete pressure: 80 kN/m²

*
Ø

Similar Machines

(Similar models of the same year with comparable operating hours.)